- Client
- UK crude oil export terminal operator
- Asset
- Offshore jetty berth loading VLCCs, with a manned control room on the platform
- Our role
- CDM Principal Contractor
- Period
- 2020 – 2022
The challenge
When tankers load at the berth, hydrocarbon vapour vents from the ship and can drift across the jetty. On one berth it was reaching the air intake of the platform control room, which houses equipment that is not rated for explosive atmospheres. A previous HVAC trip had failed to stop gas entering the room, creating a serious ignition and explosion risk to people on the platform. The fix had to be designed and installed on a live export jetty, offshore, around ship loading operations and the weather.
What we did
- Developed the scope and business case and secured investment approval
- Re-engineered the control room ventilation with dual air intakes and fire dampers, so clean air is always drawn from the side away from the vapour
- Upgraded the safety controls, with a new PLC control panel integrated with the site control system
- Replaced the HVAC compressor and refrigerant as part of the same outage
- Planned marine logistics and heavy lifts of new ductwork from a support vessel onto the jetty, with scaffold access built over the water
- Managed design, fabrication, mechanical, E&I and controls contractors through isolations, destruct, installation and commissioning
Outcome
- Both new air intakes installed, tested and commissioned, with the control system handed over as built
- Gas ingress risk to the control room removed, closing out a significant process safety finding
- Delivered offshore on a live crude export terminal, working around ship loading, isolations and the weather
Why it matters: a process safety risk to people on an offshore jetty, engineered out in one of the most exposed working environments in the industry.