CairnwickEngineering Services
Cairnwick / Engineering ServicesUK · Worldwide ●
← Case studies
Energy · High-voltage electrical · Offshore marine terminal, UK

Offshore DMO switchgear replacement

Client
UK crude oil export terminal operator
Asset
3.3 kV high-voltage switchboards on two offshore tanker loading berths, installed in the 1970s and 1990s
Our role
CDM Principal Contractor
Period
2020 – 2022

The challenge

Two loading berths were still powered through DMO high-voltage switchgear. With DMO equipment the operator opens and closes the circuit by hand, so any hesitation can cause the switchgear to fail, with potentially fatal consequences. The equipment could not be retrofitted with power-operated mechanisms, and it supplied the berths' fire water pumps, so the fire protection had to stay available throughout. All work was on an offshore jetty, around live ship loading and the weather.

What we did

  • Developed a lower-cost solution: re-feeding both berths from modern switchboards on a decommissioned part of the terminal, instead of replacing like for like
  • Commissioned power system modelling and protection studies for the new network configuration
  • Extended and modified the 3.3 kV switchboard with new vacuum circuit breakers and contactor starters, and replaced obsolete relays and components
  • Re-fed the fire water pumps and berth transformers with new 3.3 kV cabling and new cable tray routes across the jetty
  • Interfaced the fire pump controls with the new switchgear and installed a new remote switching station
  • Decommissioned redundant pump motors and equipment, and modified the switchroom layout
  • Managed the design contractor, procurement, construction and commissioning through stage-gated approval

Controls, automation and electrical · Brownfield modification and decommissioning · Capital project delivery

Outcome

  • Manually operated high-voltage switchgear removed from service on both berths
  • Fire water pumps and berth power supplied from modern, remotely switched vacuum switchgear
  • A significant electrical safety risk to operators eliminated, reusing spare capacity on site rather than building new

Why it matters: a life-safety electrical risk engineered out on a live offshore terminal, with a smarter solution that made use of what was already there.

More case studies: Offshore crane replacement · Glass recycling upgrade · Refinery flare line replacement · Fish farm pump upgrade · VLCC berth gas removal

Discuss your project →
Relevant experience

Need examples from your industry?

Tell us about your project and we will send a short selection of case studies that match it.

Request case studies