Offshore crane replacement on a normally unattended platform
- Client
- North Sea pipeline system operator
- Asset
- Pipeline hub platform in the central North Sea, run remotely from shore
- Our role
- CDM Principal Contractor
- Period
- 2022 – 2024
The challenge
The platform's crane had served for over 30 years and was at the end of its working life, yet every delivery of food, spares and equipment depended on it. Replacing it meant heavy lifts and electrical upgrades on a platform with no permanent crew, almost 100 nautical miles offshore, reachable for sustained work only from an adjacent accommodation vessel. All work had to be carried out with the platform fully live, while the subsea pipelines it connects, carrying oil and gas from a large share of North Sea fields, continued to flow.
What we did
- Developed the contracting strategy and led the tender evaluation for the new crane
- Chaired the FMECA
- Planned the marine campaign, including walk-to-work vessel access and heavy-lift operations
- Scoped the supporting switchgear upgrades
- Managed scope, cost, risk and contractor performance through each stage gate
- Planned every activity around live hydrocarbon systems, with zero interruption to pipeline operations as the governing constraint
Outcome
- A purpose-built crane for unmanned platforms selected and contracted through a structured, competitive tender
- Delivered within a 90-day offshore campaign in which 60,000 hours were worked, 410 metres of new pipework installed, 1,437 m² of coatings applied and 45 vendor partners coordinated
- A key asset secured to keep the platform operating safely and reliably to 2040 and beyond
Why it matters: complex offshore work, with limited access and many contractors, delivered through clear planning and one point of accountability.