Energy · Oil & gas pipelines · Offshore North Sea

Offshore crane replacement on a normally unattended platform

Client
North Sea pipeline system operator
Asset
Pipeline hub platform in the central North Sea, run remotely from shore
Our role
CDM Principal Contractor
Period
2022 – 2024

The challenge

The platform's crane had served for over 30 years and was at the end of its working life, yet every delivery of food, spares and equipment depended on it. Replacing it meant heavy lifts and electrical upgrades on a platform with no permanent crew, almost 100 nautical miles offshore, reachable for sustained work only from an adjacent accommodation vessel. All work had to be carried out with the platform fully live, while the subsea pipelines it connects, carrying oil and gas from a large share of North Sea fields, continued to flow.

What we did

  • Developed the contracting strategy and led the tender evaluation for the new crane
  • Chaired the FMECA
  • Planned the marine campaign, including walk-to-work vessel access and heavy-lift operations
  • Scoped the supporting switchgear upgrades
  • Managed scope, cost, risk and contractor performance through each stage gate
  • Planned every activity around live hydrocarbon systems, with zero interruption to pipeline operations as the governing constraint

Fractional project management · Capital project delivery · Procurement and package management

Outcome

  • A purpose-built crane for unmanned platforms selected and contracted through a structured, competitive tender
  • Delivered within a 90-day offshore campaign in which 60,000 hours were worked, 410 metres of new pipework installed, 1,437 m² of coatings applied and 45 vendor partners coordinated
  • A key asset secured to keep the platform operating safely and reliably to 2040 and beyond

Why it matters: complex offshore work, with limited access and many contractors, delivered through clear planning and one point of accountability.

More case studies: Glass recycling upgrade · Refinery flare line replacement · Fish farm pump upgrade · Offshore DMO switchgear replacement · VLCC berth gas removal